Problem

A manufacturer in the animal feed and cereal milling industry was dealing with a cooler system that had been in operation for 25 to 30 years. This equipment was not only outdated but also unreliable and noisy, which led to complaints from nearby businesses. The project called for a complete overhaul to modernize operations, cut down on noise, and ensure a future-proof solution—all while adhering to a tight timeline.

Impact

The aging cooler posed both operational and reputational challenges:

  • Operational risk: The outdated equipment raised the chances of breakdowns, inefficiencies, and possible production halts.
  • Community impact: The excessive noise resulted in complaints from neighbors, jeopardizing local relationships.
  • Project complexity: The replacement process required structural reinforcement, floor replacement, mechanical installation, handling equipment, and the craning of heavy machinery—all of which needed careful planning to fit within a five-week shutdown period.

Solution

GAME Engineering carried out a complete cooler replacement, seamlessly integrating customer-supplied equipment with their in-house engineering know-how:

  • Customer-supplied equipment: This included the cooler, pellet press, sieve, crumbler, fan, and cyclofilter.
  • GAME-supplied equipment and services: They provided chain conveyors, discharge screws, supporting steelwork, custom aspiration ducting, access platforms, and chutework.
  • Structural works: They fabricated steel in-house, CE marked to Execution Class 2 for load-bearing structures, and added extra steel to reinforce the cooler floor.
  • Mechanical works: A dedicated team of eight engineers worked both weekdays and weekends, totaling 2,500 hours to complete the job.
  • Craning operations: The pellet press was lifted through the roof under the watchful eye of a GAME-appointed lift supervisor, with trained signallers and slingers ensuring safety.
  • Shutdown coordination: The entire Line 4 was shut down for about five weeks, during which the customer handled electrical and control software tasks.

The project successfully rolled out a cooler system that’s not only modern and quieter but also built to last. We made structural reinforcements and replaced the flooring to boost durability, while our in-house team handled the mechanical work to ensure everything was done safely, efficiently, and on time.

For more details, feel free to reach out to Game Engineering

Phil Black - PII Editor

I'm the Editor here at Process Industry Informer, where I have worked for the past 17 years. Please feel free to join in with the conversation, or register for our weekly E-newsletter and bi-monthly magazine here: https://www.processindustryinformer.com/magazine-registration. I look forward to hearing from you!

Share
Published by
Phil Black - PII Editor

Recent Posts

Bredel CIP pump enhances hygienic processing efficiency

Watson-Marlow Fluid Technology Solutions has launched the Bredel CIP pump, designed to support hygienic and…

2 days ago

A reliable solution for Section 82 compliance

Process instrumentation specialist Endress+Hauser has developed a Continuous River Monitoring Solution to support UK water…

2 days ago

Pump Success Move as Borger UK Accelerates Growth in Shrewsbury

Borger UK, a leading pump manufacturer in the UK, which has firmly established itself as…

2 days ago

AkzoNobel Powder Coatings expands My Interpon Portal with on‑demand services to drive performance speed and sustainability

AkzoNobel Powder Coatings is strengthening support for UK powder coating businesses by expanding the capabilities…

2 days ago

BFM® fitting snap-in connectors installed on flour line to simplify maintenance

The Challenge BakeAway is a UK-based company that has been manufacturing high-quality dough for pastry, pancakes,…

4 days ago

Apex Pumps celebrates award-winning year of growth, investment, innovation and industry recognition

Bristol-based pump manufacturer reports record order book, major investment in UK manufacturing and wins top sustainability honour…

4 days ago