Listen to this article

Problem

A manufacturer in the animal feed and cereal milling industry was dealing with a cooler system that had been in operation for 25 to 30 years. This equipment was not only outdated but also unreliable and noisy, which led to complaints from nearby businesses. The project called for a complete overhaul to modernize operations, cut down on noise, and ensure a future-proof solution—all while adhering to a tight timeline.

Impact

The aging cooler posed both operational and reputational challenges:

  • Operational risk: The outdated equipment raised the chances of breakdowns, inefficiencies, and possible production halts.
  • Community impact: The excessive noise resulted in complaints from neighbors, jeopardizing local relationships.
  • Project complexity: The replacement process required structural reinforcement, floor replacement, mechanical installation, handling equipment, and the craning of heavy machinery—all of which needed careful planning to fit within a five-week shutdown period.

Solution

GAME Engineering carried out a complete cooler replacement, seamlessly integrating customer-supplied equipment with their in-house engineering know-how:

  • Customer-supplied equipment: This included the cooler, pellet press, sieve, crumbler, fan, and cyclofilter.
  • GAME-supplied equipment and services: They provided chain conveyors, discharge screws, supporting steelwork, custom aspiration ducting, access platforms, and chutework.
  • Structural works: They fabricated steel in-house, CE marked to Execution Class 2 for load-bearing structures, and added extra steel to reinforce the cooler floor.
  • Mechanical works: A dedicated team of eight engineers worked both weekdays and weekends, totaling 2,500 hours to complete the job.
  • Craning operations: The pellet press was lifted through the roof under the watchful eye of a GAME-appointed lift supervisor, with trained signallers and slingers ensuring safety.
  • Shutdown coordination: The entire Line 4 was shut down for about five weeks, during which the customer handled electrical and control software tasks.

The project successfully rolled out a cooler system that’s not only modern and quieter but also built to last. We made structural reinforcements and replaced the flooring to boost durability, while our in-house team handled the mechanical work to ensure everything was done safely, efficiently, and on time.

For more details, feel free to reach out to Game Engineering

Phil Black - PII Editor

I'm the Editor here at Process Industry Informer, where I have worked for the past 17 years. Please feel free to join in with the conversation, or register for our weekly E-newsletter and bi-monthly magazine here: https://www.processindustryinformer.com/magazine-registration. I look forward to hearing from you!

Share
Published by
Phil Black - PII Editor

Recent Posts

Repeat project success for Landia with new biogas digester mixing systems in Thailand

Across the water from Ko Samui in Thailand, Landia has successfully completed a major installation…

17 hours ago

Putting the Pressure On: Proven Flow Measurement Where Failure Is Not an Option

In high pressure fluid systems, inaccuracy is more than a measurement problem. It is a…

17 hours ago

Why the Right Equipment Is Essential for Efficient Warehouse Operations

A normal day in a warehouse involves moving tons of heavy boxes and cargo. Carrying…

3 days ago

Amarinth delivers £1.5M chemical injection skid order for Nigeria’s LNG fields

Pump manufacturer Amarinth has successfully manufactured and delivered a £1.5 million order for four bespoke…

3 days ago

How Can Someone Be Overqualified?

I’ve been a freelance for a long time now, since the mid-nineties. These days I…

1 week ago

The Tentacles of Power

I wouldn’t be overly interested in the contents of the Epstein files, nor is this…

1 week ago