Categories: Control & Automation

Future-proof Cabling Industry 4.0 Factory Upgrades

Listen to this article

HARTING Ltd today announced the latest developments in its support and advocacy for the ‘Industry 4.0’ initiative. This rapidly growing movement is driving the trend towards the so-called ‘Smart Factory’ which is enabled by the connection of the real and virtual world with sensors and actuators interfacing to The Cloud via the Internet.

New equipment to support this integrated industry approach needs to be compact, robust, modular and quick and easy to use.  It also needs to be installed in a distributed and decentralised manner, and connected to the three Industry 4.0 lifelines of Power, Signal and Data.

The latest additions to HARTING’s range of robust connector solutions provide support to these Industry 4.0 lifelines.  However they also go one-step further by providing an installer user-friendly termination design option for the key Data lifeline. This preLink® assembly concept is available in industry standard M12 and RJ45 connector styles.

In many cases, Smart Factory solutions need to be integrated into an existing factory automation control system and its associated cabling infrastructure.  preLink® allows systems integrators/installers to achieve seamless data cabling integration to such an environment through its simple and repeatable, installer friendly assembly design principle. This requires no additional skills or training and allows greater installation flexibility, saving time to minimise installation cost.

The preLink® design concept is based around using a one-step double-jaw hand press-assembly tool, terminating individual wires within an IDC terminal block.

The terminated module can then be simply loaded into either an RJ45 (male or female) or M12 male connector carrier and then parts click together to complete an assembly.

preLink® also permits future site cabling modification upgrades at minimal cost.  The low cost plastic IDC terminal block modules can easily be removed from the reusable connector carriers and placed into new connectors.  preLink® supports Fast, Gbit and 10Gbit Ethernet in both RJ45 and M12 style connectors.

For RJ45 connections, HARTING also offers preLink® Extenders enabling simple cabling extensions, maximising installed flexibility.  Where installations allow pre-defined cabling lengths, HARTING can provide pre-terminated end-to-end preLink® terminal block patch leads.

These can be very easily fed through trunking-runs in tight, difficult spaces before being quickly hand inserted into appropriate connector carrier-ends, alleviating time-consuming field assembly cabling.

For more information, please contact John Law (EC Product Manager) at HARTING’s Northampton sales office on 01604 827500 or go to www.harting.co.uk

HARTING

Share
Published by
HARTING

Recent Posts

Bredel CIP pump enhances hygienic processing efficiency

Watson-Marlow Fluid Technology Solutions has launched the Bredel CIP pump, designed to support hygienic and…

5 days ago

A reliable solution for Section 82 compliance

Process instrumentation specialist Endress+Hauser has developed a Continuous River Monitoring Solution to support UK water…

5 days ago

Pump Success Move as Borger UK Accelerates Growth in Shrewsbury

Borger UK, a leading pump manufacturer in the UK, which has firmly established itself as…

5 days ago

AkzoNobel Powder Coatings expands My Interpon Portal with on‑demand services to drive performance speed and sustainability

AkzoNobel Powder Coatings is strengthening support for UK powder coating businesses by expanding the capabilities…

5 days ago

BFM® fitting snap-in connectors installed on flour line to simplify maintenance

The Challenge BakeAway is a UK-based company that has been manufacturing high-quality dough for pastry, pancakes,…

6 days ago

Apex Pumps celebrates award-winning year of growth, investment, innovation and industry recognition

Bristol-based pump manufacturer reports record order book, major investment in UK manufacturing and wins top sustainability honour…

6 days ago