Spirax Sarco helps Courtaulds become the UK’s first eco-factory supplier to Marks and Spencer

Listen to this article

Spirax Sarco’s steam system expertise and long-term support have helped Courtaulds” West Mill hosiery plant in Belper, Derbyshire become Marks & Spencer”s first UK supplier site to gain eco-factory status. The story doesn’t end there, as Spirax Sarco is currently helping Courtaulds on production improvements and upgrades that could deliver significant savings in steam consumption at the Belper site.

Courtaulds gained eco-factory status last year, making it the first UK supplier site to win the coveted recognition from M&S. The eco-factory scheme is part of the wider drive by M&S to operate its entire supply chain more sustainably, with only 18 M&S suppliers around the world making the grade at that time.

“Without the assistance and technical support of Spirax Sarco we wouldn’t have achieved the targets we’ve managed so far, let alone our future energy saving targets,” says Courtaulds’ Group Engineering Manager Steve Large. “We have to save energy wherever possible – it’s the way we’ll stay in business.”

Steam is an important utility at the site, which manufactures around a third of all M&S hosiery. It is chiefly used in dyeing (where the yarn is coloured) and boarding (where the hosiery is shaped and pressed) applications that can often utilise up to 7 tonnes of steam per hour. Most of the existing steam system equipment around the site has been supplied by Spirax Sarco.

The latest steam system improvements are due to take place shortly and will significantly increase steam usage due to production expansion. Courtaulds and Spirax Sarco are continually working together to improve the overall efficiency of the steam and condensate system. The steam system upgrades are intended to improve efficiency by 20%, according to Mr Large.

Courtaulds has worked hard for the last five years to improve its sustainability credentials and has already reduced its energy consumption by 50%, cut water consumption by 20% and eliminated waste to landfill.

The process undertaken to win the coveted M&S eco-factory status has involved a whole range of initiatives, including an integrated building management system, policies around turning off lights, preventing air leakages, voltage optimisation and lower energy lighting. Courtaulds is also recovering heat from the hot effluent from dyeing to heat fresh water for the next batch.

Spirax Sarco

Share
Published by
Spirax Sarco

Recent Posts

BFM® fitting snap-in connectors installed on flour line to simplify maintenance

The Challenge BakeAway is a UK-based company that has been manufacturing high-quality dough for pastry, pancakes,…

2 days ago

Apex Pumps celebrates award-winning year of growth, investment, innovation and industry recognition

Bristol-based pump manufacturer reports record order book, major investment in UK manufacturing and wins top sustainability honour…

2 days ago

Six Foam Transfer Pumps Delivering Reliability in Critical Fire Suppression

In this latest case study, we explore the vital role of foam transfer pumps within…

7 days ago

Full steam ahead: why training is vital to optimise steam applications

Often misunderstood, steam powers a wide range of modern industrial processes, from precision industrial-scale cooking…

1 week ago

Chlorine filtration in dialysis: how advanced sensing is raising the bar

In 2022, more than 30,000 people in the UK were undergoing kidney dialysis. For every…

1 week ago

We Don’t Sell Metal. We Sell Solutions.

In feed milling, customers know exactly what they are doing.They work with carefully developed formulations,…

2 weeks ago