The latest issue off PII is out now!

Read here!
Solids Handling & Processing

Leading consumer product company refurbishes key process equipment

Listen to this article

Schenck Process have recently successfully completed the refurbishment of key process equipment at the Proctor and Gamble site at London to ensure the efficient running of the plant.  The work was carried out in the purpose made Refurbishment Cell at the Schenck Process’ factory near Doncaster and caused minimal disruption the client’s operations. By refurbishing the equipment off-site this eliminates the need for any on-site supervision, work instructions and permits to be issued.

The refurbished equipment is part of the pneumatic conveying systems that has been supplied by Clyde Process, who are now part of the Schenck Process Group.  The conveying systems at Proctor and Gamble handles a variety of materials

Central to all Schenck Process pneumatic conveying systems is the Original Dome Valve® which is a fast acting control valve.  The refurbishment of the valves includes inspecting the dome for abrasive wear, replacing shaft bearings and seals where required and testing the operation of equipment and issuing a certificate of conformity.  These are part of the 12 step refurbishment programme available on this product and other components of Clyde Process and Schenck Process pneumatic conveying systems.

Photo of vishnu detroja
Free Package

Show More

    Would you like further information about this article?

    Add your details below and we'll be in touch ASAP!


    Input this code: captcha

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Back to top button

    Join 25,000 process industry specialists and subscribe to:

    PII has a global network of suppliers ready to help...