Fluids Handling

TESEO AIRLINE SYSTEM CAN BE DRILLED UNDER PRESSURE

Listen to this article

To expand a TESEO modular aluminium pipeline system, there is no need to turn off the compressor, shutting down all other work stations and losing all the pressure in the network.

The TESEO magic formula! To open a new air point on an established system under full pressure simply fix the outlet plate where you want it on the pipe run, screw in a ball valve to the outlet plate, screw the special TESEO drilling jig to the ball valve, open the ball valve to allow the drill bit through and drill the aluminium extrusion piping. Swarf is collected in the drilling jig. Remove the drill bit and shut the ball valve, remove the drilling jig, couple up your additional airline or drop column to the ball valve and hey presto, an instant new air point installed in a “live” pipeline without loss of pressure.

For more information contact;

Teseo UK Ltd, Witham, Essex

Tel: 0870 167 2150 Fax: 0870 167 2151

E-mail: sean@teseoair.com Web: www.teseoair.com

Show More

    Would you like further information about this article?

    Add your details below and we'll be in touch ASAP!


    Input this code: captcha

    Phil Black - PII Editor

    I'm the Editor here at Process Industry Informer, where I have worked for the past 17 years. Please feel free to join in with the conversation, or register for our weekly E-newsletter and bi-monthly magazine here: https://www.processindustryinformer.com/magazine-registration. I look forward to hearing from you!
    Back to top button

    Join 25,000 process industry specialists and subscribe to:

    PII has a global network of suppliers ready to help...