Categories: News & Events

Anaerobic Digestion trade association welcomes Green Gas Support Scheme application window extension to March 2028

Listen to this article

The Department for Energy Strategy and Net Zero (DESNZ) announced on Saturday (21 October) that it was extending the deadline to apply to the Green Gas Support Scheme from the proposed 31 March 2026  in its Mid-Scheme review consultation to 31 March 2028.    

This offers a two-year additional window for anaerobic digestion (AD) plant operators to ensure that at least 50% of the biomethane output from new AD sites is generated from organic wastes – the key criteria to receive government funding through GGSS. This coincides with Defra’s announcement of Separate Food Waste Collections (1) needing to be put in place in England by 2026 – which will significantly increase the volume of organic waste feedstock available to AD operators. 

Chris Huhne, chair of the Anaerobic Digestion and Bioresources Association (ADBA), welcomed the announcement:  “This extension of the application deadline for the Green Gas Support Scheme is great news for the industry.  It follows the recommendation we had made to DESNZ in response to the mid-term scheme review they issued back in March. We had specifically requested at least two more years to allow AD operators to put the appropriate contracts and infrastructure in place to achieve the GGSS-eligibility ratio, and this will enable them to do so.” 

This also means that we can expect a good amount of new biomethane plants coming online in the coming years – driving a spike in sector growth similar to when the Renewable Heat Incentive, Feed In Tariffs and Renewable Obligation schemes were introduced. Not only is this good for the industry, it’s also great news for society as a whole, as we address the impacts of climate change and seek to ensure energy and food security in the UK.” 

The extension announcement comes ahead of the actual publication of the GGSS Mid-Scheme Review, which is due to be released before the year ends. ADBA also expects positive news on the other proposals outlined in the consultation. 

  1. Read ADBA’s press release relating to Defra’s announcement
Phil Black - PII Editor

I'm the Editor here at Process Industry Informer, where I have worked for the past 17 years. Please feel free to join in with the conversation, or register for our weekly E-newsletter and bi-monthly magazine here: https://www.processindustryinformer.com/magazine-registration. I look forward to hearing from you!

Recent Posts

Real-time monitoring cuts pollution risk at Scottish Water site

When a strategic Scottish Water pumping station had to be taken out of service unexpectedly,…

2 days ago

Watson-Marlow to showcase scalable peristaltic pump range and single use assemblies at BioProcess International Europe 2026

Watson-Marlow to showcase scalable peristaltic pump range and single use assemblies at BioProcess International Europe…

2 days ago

Carrots are tops for glowing Landia Chopper Pumps

Providing essential aeration in settlement pits, Landia Chopper Pumps have completed a decade of reliable…

7 days ago

Amarinth defies space constraints with technical breakthrough for major LNG expansion project

Amarinth has successfully engineered a bespoke suite of API 685 VS4 magnetic drive pumps for…

7 days ago

Degasser for volatile and aggressive solvents

Biotech Fluidics has introduced the DEGASi® Integration HFIP, a high performance online degassing system engineered…

7 days ago

Media separated pressure relief valve protects components and optimises control

Flow control specialist Bürkert has introduced a new pressure relief valve designed to protect sensitive…

7 days ago