Fast-Track Implementation of a New CIP and Steam Heating System for a Leading Food Manufacturer

Listen to this article

Executive Summary

CIP solution storage tanks – layout detail
CIP solution storage tanks – layout detail

When the Clean-In-Place (CIP) system at a major global food manufacturer failed unexpectedly, rapid action was essential to prevent production downtime. Raptronic Process Engineering (RPE) immediately mobilised, reallocating resources to design and install a fully customised replacement under extreme time pressure — with the first stage commissioned between Christmas and New Year.

The project was delivered in two phases:

  • Phase 1 – 2023: Design and installation of new CIP tanks under severe space and structural constraints.
  • Phase 2 – 2024: Development of a bespoke steam heating system with a pre-assembled pumping and valve matrix, enabling fast installation and minimal downtime.

CIP (Clean-In-Place) valves manifolds on the production site in food industry
CIP (Clean-In-Place) valves manifolds on the production site in food industry

Project Background

The client’s CIP tanks had reached end of life, with leaks creating a serious risk of extended disruption. RPE responded immediately, reorganising priorities to deliver a reliable, long-term solution within an extremely compressed schedule.


CIP SOLUTION STORAGE TANKS – on the production site, manufactured by RAP Steel Production
CIP SOLUTION STORAGE TANKS – on the production site, manufactured by RAP Steel Production

Project Delivery

Phase 1: New CIP Tanks (2023)

  • Challenges: Tight deadline, restricted access for tank delivery, strict structural load requirements, and very limited piping space.
  • Outcome: New tanks, manufactured in part by RAP STEEL Production, were installed and commissioned between Christmas and New Year, ensuring uninterrupted production.

Phase 2: Steam Heating System & Valve Matrix (2024)

  • Challenges: Highly customised design, multiple supplier iterations, and the need for safe operation within a confined footprint.
  • Outcome: A fully commissioned steam system met all performance and safety standards. Off-site pre-assembly of pumps and valves enabled rapid on-site installation with minimal disruption.

Key Success Factors

The project succeeded thanks to:

  • Transparent communication and flexible collaboration.
  • 24/7 coordination between RPE and the client’s project team.
  • Iterative design cycles adapted to evolving requirements.
  • Dedication of RPE’s and RAP Steels’s engineering team and supplier network.

CIP (Clean-In-Place) valves manifolds on the production site in food industry
CIP (Clean-In-Place) valves manifolds on the production site in food industry

Conclusion

RPE turned a critical equipment failure into a showcase of agility and reliability in industrial project management. By applying an iterative, collaborative approach more often seen in software development, RPE delivered complex process solutions on time and under pressure — keeping production moving for one of the world’s largest food manufacturers.

RAP TRONIC PROCESS ENGINEERING, RAP STEEL PRODUCTION and RAP SYSTEMS – Industrial Automation are companies of RAP GROUP

RAP Tronic Process Engineering

RAP Tronic Process Engineering offers End-to-end project management and turnkey process engineering solutions, from custom equipment design and development to advanced automation.

RAP Steel Production

RAP Steel Production manufactures stainless steel equipment for industries such as food, chemical, or pharma. From design to production RAP Steel perfectly complements the services of the companies in the group, with a well-trained team ready to meet the most complex challenges.

RAP Systems


RAP Systems is the company within RAP Group specialised in providing industrial automation and process control solutions.

To learn more about how RAP Companies can support the food and process industries, please visit:

www.raptronic.ro: Contact person: Bogdan Urdea: Sales Manager:  +40 726 222 843

www.rap-steel.ro: Contact Person: Marius Stefan Sales Manager: +40 736 106 410

www.rap-systems.ro: Contact Person Silviu Cucuian: + 40  723 350 982

Show More

    Would you like further information about this article?

    Add your details below and we'll be in touch ASAP!


    Input this code: captcha

    Phil Black - PII Editor

    I'm the Editor here at Process Industry Informer, where I have worked for the past 17 years. Please feel free to join in with the conversation, or register for our weekly E-newsletter and bi-monthly magazine here: https://www.processindustryinformer.com/magazine-registration. I look forward to hearing from you!
    Back to top button

    Join 25,000 process industry specialists and subscribe to:

    PII has a global network of suppliers ready to help...