Innovia To Save £80,000 Per Year Following TLV Steam Survey

Listen to this article

Following an initial site audit and steam trap survey, steam solutions specialist TLV Euro Engineering has supplied and installed a number of efficient solutions on an existing steam line at Innovia Films, with energy savings from the installation already reaching 10MW per day and £80,000 per year!

Innovia Films is a major producer of highly differentiated speciality Biaxially Oriented Polypropylene (BOPP) films for some of the world’s best-known brands across a wide variety of everyday consumer goods, including home and personal care products, food and beverage, confectionery, tobacco, luxury goods and industrial applications.

The company’s manufacturing facility houses film-making machines, with steam used throughout the 24-hour bubble and coating processes as well as for space heating during colder seasons.

For the bubble process, films are blown into a bubble to thin the material, which is then passed through one of eleven machines that convert the film into split sheets. These sheets are then passed through steam-heated rollers to reheat it, allowing it to relax before it is wound onto reels.

tlv innovia films2
tlv innovia films1

Steam is also used for the three machines on the coating process line, where various acrylic and latex coatings are applied to films that are subsequently reheated via steam batteries that blow warm air through fans to dry the coatings onto the film. While there are only three machines on the coating line, this process requires 3 and 10 BarG of steam pressure, consuming most of the steam raised at Innovia.

For many years, these processes have always seen a percentage of flash steam (steam formed from hot condensate when the pressure is reduced) vented to atmosphere. So Innovia invited tenders from several steam specialists that would look at engineered solutions to recover the flash steam energy rather than it simply re-entering the atmosphere.

The solution proposed by TLV Euro Engineering replaced the existing spray condenser with a pair of atmospheric heat exchangers to recover the flash steam energy and divert it back to the feedwater in the plant room. This meant more pre-heated boiler feedwater was available, which subsequently reduced the energy required for heating new, cooler feedwater. 

TLV Euro Engineering also installed a new electrical condensate return package and several flow meters at various locations throughout the steam and condensate lines to collect data.

Explaining the process, TLV Euro Engineering’s regional sales engineer John Lea says: “Innovia now has a higher volume of heated water going back to the plant room and boiler because the new recovery system sends treated water from the boiler plant out to the large condensers that we specified and installed.

This warms the water with steam that’s vented off the condensate which, combined with the condensed flash steam, returns to the feedwater tank. This combination of using the steam to heat water and condensing steam to provide hot water means approximately three tonnes of steam per hour is being saved!

Innovia had attempted flash steam recovery in the past, but the process didn’t work because the adopted open-vessel system – which sprayed water into the flash steam to condense it – couldn’t get enough water in to condense the steam effectively.

Unlike our existing attempt at a direct injection flash steam recovery system, the TLV system adopts shell-tube condensers, which separate the water from the steam to increase the surface area and condense the flash steam more efficiently.says Michael Edmondson of Innovia Films.

tlv site audit

Commenting on the decisions to approve the tender from TLV Euro Engineering, Michael says:The solution from TLV was more cost-effective than the others we received, and they were working with us to design a solution that worked for us and our processes, rather than something off-the-shelf. We were also impressed with the after-sales support TLV promised, which was something we weren’t confident of getting from the other suppliers that tendered.”

Looking at the data compiled to date, Innovia estimates a possible return on investment within two years and savings of approximately £80,000 a year. “We’re in the process of quantifying savings, but steam on site costs £26 per tonne so the predicted saving of over 3,000 tonnes of steam results in the anticipated £80,000.00.” says Michael.

For further information, call TLV Euro Engineering on +44 (0)1242 227223, email sales@tlv.co.uk or visit www.tlv.co.uk

Show More

    Would you like further information about this article?

    Add your details below and we'll be in touch ASAP!


    Input this code: captcha

    Phil Black - PII Editor

    I'm the Editor here at Process Industry Informer, where I have worked for the past 17 years. Please feel free to join in with the conversation, or register for our weekly E-newsletter and bi-monthly magazine here: https://www.processindustryinformer.com/magazine-registration. I look forward to hearing from you!
    Back to top button

    Join 25,000 process industry specialists and subscribe to:

    PII has a global network of suppliers ready to help...